Changes to the Patterson River rail bridge would NOT require a closure of the Frankston line for up to six months

A new road bridge connecting Station Street to Station Street over the Patterson River is planned.
This can be used as a temporary rail by-pass whilst any changes to the Patterson River rail bridge are completed.

Carrum temporary rail by-pass
Carrum temporary rail by-pass

Allowing for a safety fence 3m from the by-pass rail track access to properties either side of Patterson River remain unaffected.
This will require a stronger bridge for the train use but any additional height caused by deeper spans can be accommodated with the more lenient road design rules and/or service road use.
And this is working on a two-track by-pass where train schedules will not have to be altered.

But even with a single-track by-pass all trains can be accommodated ~